EasyManua.ls Logo

Eaton BladeUPS - Page 16

Eaton BladeUPS
37 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
Eaton BladeUPS Bar Installation Guide S 164201723 Rev 2 www.eaton.com/powerquality
12
15. BladeUPS Bar 4-High. Install two M6 12 hex bolts in each of the
bar's two mounting brackets, securing the length of the bar to the
rack. See Figure 6. Torque the bolts to 5.1 ± 0.8 Nm (45 ± 7 lb in).
16. BladeUPS Bar 6-High. Install two M6
12 hex bolts in each of the
bar's three mounting brackets, securing the length of the bar to the
rack. See Figure 6. Torque the bolts to 5.1 ± 0.8 Nm (45 ± 7 lb in).
17. Install an M4
8 pan-head screw to secure the wireway top panel
to the bar. See Figure 6.
Rear of Rack
M6
12 Hex Bolts
through Rack to
Terminal Block
Assembly Bracket
(3 places)
M6
12 Hex Bolts
(2 places) per
Mounting Bracket
NOTE One mounting
bracket shown.
Terminal Block
Assembly Bracket
Stud (at position 5)
Front of Rack
Bar
M4 8
Pan-Head
Screw
Figure 6. Bar Brackets Installation

Other manuals for Eaton BladeUPS

Related product manuals