EasyManua.ls Logo

Eaton BladeUPS - Page 17

Eaton BladeUPS
37 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
Eaton BladeUPS Bar Installation Guide S 164201723 Rev 2 www.eaton.com/powerquality
13
NOTE Loosening the mounting brackets slightly may allow easier alignment to the vertical
rail of the rack. Retighten the mounting brackets when alignment is complete.
18. Using two M6 12 hex bolts, secure the left side of the wireway
terminal block housing to the rack. See Figure 7. Torque the bolts to
5.1 ± 0.8 Nm (45 ± 7 lb in).
19. Using six M4
8 pan-head screws, secure the wireway terminal
block housing to the wireway and to the bar. See Figure 7. Torque
the screws to 1.7 ± 0.2 Nm (15 ± 2 lb in).
M6 12 Hex Bolts
(2 places)
M4 8 Pan-Head Screws
(6 places)
Wireway
Terminal Block
Housing
OUTPUT
A
OUTPUT
B
OUTPUT
C
INPUT
A
INPUT
B
INPUT
C
NEUTRAL
Rear of Rack
Front of Rack
Figure 7. Wireway Terminal Block Housing Installation

Other manuals for Eaton BladeUPS

Related product manuals