EasyManua.ls Logo

Eaton Cooper Power CL-6 Series - Replacing the Control

Eaton Cooper Power CL-6 Series
128 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Replacing the control
To place a control into the control enclosure, follow the
procedure outlined below:
1. Engage control on enclosure hinges.
2. Connect control ground lead to back panel.
3. Reconnect control to back panel at TB2, located at the
bottom of back panel.
4. Push closed disconnect switch V1 (and V6 if present).
5. Pull open current shorting switch C.
6. Close control and tighten locking screws.
17
CL-6 SERIES CONTROL INSTALLATION, OPERATION, AND MAINTENANCE INSTRUCTIONS MN225016EN January 2016

Table of Contents

Related product manuals