COOLY C35HD BLACK EN
42
www.eberg.eu
START-END OF SEASON OPERATIONS
START OF SEASON CHECKS
Make sure the power cable and plug are undamaged and the earth system is ecient.
Follow the installation instructions precisely.
END OF SEASON OPERATIONS
To empty the internal circuit completely of water,
remove the cap(g. 32).
Run o all water left into a basin. When all the water
has been drained, put the cap back in place.
Clean the lter and dry thoroughly before putting
back.
LIMIT CONDITIONS
Temperature of room 18-35°C (64-95°F)(Cooling)
Temperature of room 10-25 °C (50-77°F) (Heating)
DIMMENSIONS
Width 435 mm
Height 715 mm
Depth 350 mm