153 INCH CHIPPER/SHREDDER
ENGLISH
SERVICE & MAINTENANCE
WARNING
There are several optional discharge screens available in
1.
discharge screen.
2.
3.
the top down.
4.
5.
inward so bolt holes align.
6.
5.8 CHANGING THE DISCHARGE SCREEN
BOLT
5/16" X 7/8"
DISCHARGE
SCREEN
5/16" NUT
DANGER
SHARP KNIVES,
KEEP OUT!
Figure 5.3 - Replacing the Discharge Screen
The belt guide aids in disengaging the chipper/shredder.
1.
2.
Engage the clutch with the belt in place and check idler 3.
4.
idler bracket bushings.
5.
guide. Retighten mounting bolts.
Reinstall upper shield.6.
7.
Figure 5.4 - Belt Guide Adjustments
BELT GUIDE
BELT
LOWER
BELT GUARD
ENGINE
PULLEY
IDLER
PULLEY
ROTOR
PULLEY
CHECK BY SLIDING
POSTCARD HERE
UPPER
Remove the bolt securing the discharge screen to the 1.
2.
Install discharge screen and retaining bolt.3.
5.9 CLEARING A PLUGGED ROTOR
5.10 BELT GUIDE ADJUSTMENTS