|5
When drilling holes, avoid the water pipes and power cables buried in the wall and
under the floor.
When drilling holes, protect the battery base from shavings or dust.
Before installing the battery, make sure that the click-on terminals on the top and
bottom of the battery are free of foreign objects or any liquid.

Sealant is applied underneath the battery base to ensure its resistance against water.
There will be a gap between the battery junction box and the battery pack before the
screws are tightened. This gap is caused by the mechanical design to meet the IP rating,
and will normalize after the screws are tightened.
(Optional) Install the provided adjustable feet to the base if needed. Then you
can adjust the feet and check the level on the base to ensure that the base is placed
horizontally, screw the nuts of the four feet to the top to lock.

Assign enough personnel (two or more) to move battery to avoid personal injury and
battery damage.
When moving battery, hold handles on top of the battery module.

Installing
Battery

1 2
×1
C1
×4
C2
C2
Wrench
(14mm)
65-85mm
3 4
×1
C4
C4
1
3
5
2
4
6