28
After positioning the thermal stove and installing all the smoke discharge pipes, the hydraulic plant can
be connected. First of all make sure that the bleeder valve ( 1 ), on the top right-hand side of the boiler
(see images below) is closed when the water is lling as shown in the gure below.
Connect the boiler connections (see gures below) to the water plant, bringing the plant’s pressure from
1 to 1.3 bar when the thermal stove has not yet been lit (if the plant has an open tank and not a closed
one, the setting reserved for authorised technicians must be changed).
Now proceed with bleeding the water plant from the valve tted on the boiler or from the valves tted on
the radiators. This operation can be carried out several times even after the boiler has been switched
on since, when the water temperature starts to increase, the air bubbles move towards the upper part
of the boiler itself.
When bleeding the boiler, make sure that the electrical parts near the valve do not get wet! If this should
happen, do not switch the boiler on but use a hair-dryer to dry the electronic board.
1
IMPORTANT
FILLING MUST BE CARRIED OUT VIA THE “T” PIPE FITTING LOCATED ON
THE WATER DELIVERY, FILLING AT A MAXIMUM OF 1.2 BAR (see 2 below)
2
Radiators return
Domestic hot water outlet
Domestic cold water inlet
Radiator delivery
Safety discharge
¾ inch
¾ inch
½ inch
Figure 21.
Radiators return
Radiator delivery
¾ inch
¾ inch
Safety discharge
Figure 22.