3. Keep water flowing through the faucet for the
next step.
4. For 60 seconds after “power ON”, display will
countdown from 60 seconds to 0. When the display
timer reaches 45, the unit starts heating.
5. After the 60 seconds in step 4, the display will
show temperature setpoint.
The heater is considered commissioned at this point.
Faucet can be turned off and used as needed.
Note: the temperature display will turn off after 5
minutes of inactivity. Display turns on when water
flows through heater or if either pushbutton is
pressed.