3. Storage, handling & unpacking
The Fusion E10 Combi is protected in corrugated packaging with reinforced corner posts.
The assembly is wrapped in heavy duty polythene. The Fusion E10 Combi unvented fitting
kit is supplied within the boiler. The assembly must be stored upright, under cover in dry
conditions. Units must not be stacked. The packaging must be removed prior to installation.
Note the weight of the product and the handling instructions applied to the packaging.
If using a handling device, eg. a sack barrow, to manually move the Fusion E10 Combi,
trucking must be done from the rear to avoid damage to the outer panels.
The Fusion E10 Combi should be lifted and handled by two persons. Handholds are
provided in the top rear panel and underneath at the front of the Fusion E10 Combi
assembly to aid lifting. Stooping should be avoided and protective clothing worn when
necessary.
Care must be taken when removing the packaging to avoid any damage to the surface
of the unit.
The packaging is recyclable and should be disposed of in accordance with environmental
guidelines.