Commissioning
Flue gas analysis
Full load (Step 1/3)
Legend
1. Measuringpointfortheuegas
probe.
Step 1: Check on full load
Step 2: Check on low load
Step 3: Adjustment (if necessary).
Step 1: O
2
/ CO
2
check on full load
The O
2
or CO
2
setting is preset at the
factory to E, namely natural gas, for all
equipment units. A calibrated O
2
or CO
2
control measurement must be carried
out during commissioning.
- Ensure that the boiler is in
operation and that the heat, which
it produces, can be discharged.
Set the load of each engine
- Press the chimney sweep button for
5 seconds;
- Select with “+” or “–” burner 1 or 2
(in case it is present). Press OK;
- The boiler will switch to CH power
shown on the screen.
The modulation rate can now be
adjusted between minimum 0%
and maximum 100%.
- Press the “+” button until you reach
100%;
- Press OK;
The selected engine will switch
to max power output, the screen
shows 100% (heating capacity).
- Calibrate the Flue Gas Analyser,
andtheninserttheuegasprobe
of the Flue Gas Analyser into the
measuringpointoftheuegaspipe
“1” (see illustration);
- Wait for one minute and then carry
out a combustion analysis;
- Check whether the O
2
/CO
2
values
that are listed below correspond to
the measured value.
After this check has been done, once
more test the O
2
/CO
2
value at low load
(see Step 2 on page 87). If there are
any deviations in the result, then these
must be corrected (see Step 3 on
page 88).
O
2
/ CO
2
check on full load (Step 1)
Full load Natural gas (G20) Propane (G31)*
O
2
Nominal 4,8% Nominal 5,0%
Minimum 4,1%, maximum 5,6% Minimum 4,5%, maximum 5,4%
CO
2
Nominal 9,0% Nominal 10,5%
Minimum 8,6%, maximum 9,4% Minimum 10,2%, maximum 10,8%
Values are valid with closed cover/air box. *only possible if LPG conversion kit is installed
The O
2
/ CO
2
check consists of 2 steps or, if necessary, 3 steps:
5 sec.
1
Set the load of complete boiler
- Press the chimney sweep button
for 5 seconds;
- Select with “+” or “–” burner 1+2
The Chimney Power Level is now
Settable (with “+” and “–” buttons)
between the minimum Power and
the maximum Power of the complete
boiler.