DIGITAL CONDUCTIVITY METER
The information contained in the accompanying document is proprietary and confidential, and may not be
copied in any manner whatsoever without prior written consent of Emcee Electronics, Inc. The document
and the material therein may not be used for any purpose other than that intended by Emcee Electronics,
Inc.
COPYRIGHT 1984 EMCEE ELECTRONICS, INC.
REVISION DATE: JANUARY 10, 2019
Page 8 of 20
7.0 TEST PROCEDURE
7.1 Attach probe to bottom connector on
conductivity meter.
7.2 Depress MEASURE switch (M) with probe
OUT of fuel sample. Reading should be 000
+/- 001 in approximately 3 seconds (Figure
4). If reading is outside limits, remove
probe and recheck zero by depressing MEASURE
switch.
7.2.1 If zero adjustment is okay without
probe but not when probe is attached, the
probe should be thoroughly rinsed with
isopropyl alcohol followed by reagent grade
toluene and allowed to air dry before
retesting for zero.
7.2.2 If the reading is outside of limits
with the probe removed, perform calibration
procedure outline in Section 10.0.
7.3 Depress CALIBRATE switch (C) with
probe OUT of fuel sample. After 3 seconds,
reading should be 10 times the probe
calibration number +/- 005 (Figure 4).