Section 7: Scheduled Maintenance and Operational Testing
Scheduled Maintenance and Operational Testing
e. Place both lter/strainer seals item (2) on to the ends of the reassembled outer
and inner lters and insert into the manifold body item (1).
f. Using a generous amount of grease or hydraulic uid on the two hex cap o-rings
item (6) screw the hex caps into the body until the hex cap bottoms out. No
specic torque is required for tightening since the hex cap design is a straight
thread/o-ring sealing designed component.
Note: before re-installing the hex caps (2) and o-rings (6), visually inspect the
o-rings (6) for any nicks or abrasions. Replace o-rings if worn or cuts are observed.
Notes:
- Recommended replacement period for both lter/strainer elements 5 years.
- Recommended cleaning for both lter/strainer elements annually, or more often based on
power gas cleanliness.
2. Drain contaminants from gas/hydraulic tank(s) and rell to proper tank levels.
Refer to Figure 6.
NOTE:
If equipped with additional gas lters, check elements and consider replacing them as it may be
clogged with contaminants.
3. Refer to Section 2 to ensure that proper method of operation is followed.
4. Check manual operation with handpump, refer to Section 2.
a. There should be noticeable suction on the suction stroke, decreasing as the pump
cylinder lls, indicating suction lines are open and full of uid.
b. Handle effort on the pressure stroke will depend on line pressure and line
valve position.
c. Pressure stroke should be smooth and feel solid, not spongy, indicating pressure
lines are open and full of uid.
d. At the end of operator stroke (line valve open or closed) the handle should
stop solid on the pressure stroke, indicating no bypass ow in operator or hydraulic
components.
e. Test by applying 150 lb force for two minutes to the pump handle provided with
the unit.
f. Press relief knob to move clevis and handle in the down position.