EasyManua.ls Logo

Emerson BETTIS 23 SH - Section 11: Operator Disassembly; Operator Disassembly

Emerson BETTIS 23 SH
42 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
November 2021
Installation, Operation and Maintenance Manual
DOC.IOM.RG.US Rev. 11
20
Section 11: Operator Disassembly
Operator Disassembly
Section 11: Operator Disassembly
Tools and equipment required are:
For Series 3
1-1/2 Impact or hammer wrench
1-1/2 Hex socket and long extension
3/8 Socket Hex Key
For Series 6
2-1/2 Impact or hammer wrench
2-3/8 Hex socket and long extension
5/8 Hex Key
For Series 7
3-1/8 Impact or hammer wrench
3-1/8 Hex socket and long extension
3/4 Hex Key
Other tools that are also required includes:
A set of standard imperial size wrenches and sockets through 1-1/2" Hex keys, size 1 /16"
through 5/8"
A pair of 8" or longer screwdrivers
A container, funnel, 10 micron lter, exible hose and ttings to drain and salvage
hydraulic uid
Solvent
Sealant (eg. Silicone)
Lubricant (petroleum grease, petroleum jelly, hydraulic uid)
Anaerobic adhesive (eg. "Loctite")
1. Shut off power gas supply; disarm automatic control and blowdown power gas.
2. Using the handpump, stroke operator against the stop, remove end stop cover, then replace
o-ring. Re-install cover and tighten.
NOTE:
When end stop cover is removed, some uid will run out.

Related product manuals