Drawings and Schematics
Field Service Request
To assist in providing service/assistance with your equipment, the following information is requested:
A. Contact/Responsible
Name Company
Position Site/Project Identication
Phone Fax Pager
B. Valve Operator Rotary Linear/Gate
Model Serial Number
Application: Mainline Block/Linebreak ESD
Mainline Valve Station Bypass
Unit Suction/Discharge Block
Meter Station Shut In/H
2
S Shut In
PIG Launcher/Receiver
C. Problem Identied During:
Installation Commissioning Operation Maintenance
D. Problem Identied as:
(If operator/valve travel is open/closed fully or partially, how far?)
E. Checklist for often-overlooked causes
Tank uid levels are correct for operation
Power gas of sufcient pressure and ow is present
ESD/Linebreak system is reset
Operator travels fully and smoothly
Speed controls are more than 25% open
Correctly mounted on valve, ie. valve open/operator open/stops sets
Exhausts not restricted or vented to header system with backpressure
All relays and solenoids are switching
Conrm if signals are being applied and removed as required
F. Identify Component(s) that may cause the problem
List any adjustments that were made by others
G. Conditions under which problem occurs
Flowline Operator Gas Supply
Pipeline Pressure psi (kPa) From Pipeline psi (kPa)
Differential Across Valve psi (kPa) From Fuel Gas Line psi (kPa)
Pipeline Rate of Drop psi (kPa)/minute
Other/Weather
H. Requirements