EasyManua.ls Logo

Emerson Bettis CBB Series - Page 24

Emerson Bettis CBB Series
33 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
October 2015
Service Instructions
VA001-196-30 Rev. 1
21
Section 4: Actuator Testing
Actuator Testing
4�1�9 If an actuator was disassembled and repaired as a result of this procedure, the
above leakage test must be performed again.
4�1�10 Shell Pressure Test: Optional pressure test could be performed on the actuator by
applying pressure to both sides of the piston simultaneously for a period of two (2)
minutes. If any leakage occurs across a static seal, the unit must be disassembled
and the cause of leakage determined and corrected.
WARNING: FIELD TEST ACTUATORS WITH CARE
The actuator's main pressure bearing parts will be tested in controlled conditions by
pressuring both sides of the piston to avoid damage and over torquing of the actuator
components.Iffurtherfuturetestingintheeldisnecessary,Emersonshouldbecontacted
for guidance.
4�1�11 After the actuator is installed back on the valve all accessories should be hooked
up and tested for proper operation and replaced, if found defective.

Other manuals for Emerson Bettis CBB Series

Related product manuals