Periodic Test and Maintenance Requirements
7�3 Partial-Stroke Test
The “Partial-Stroke Test” (“On-line”) can be performed to improve the PFD
AVG
value.
A typical partial-stroke value is 15% of the stroke.
The “Partial-Stroke Test” (“On line”) can be performed to satisfy PFD
AVG
(average
probability of failure on demand) value.
Recommended Test Interval = 1 to 3 months.
Procedure:
Operate the Actuator/Valve assembly for No 1 open/close cycles 15/20%
of the stroke.
Verify the Correct performing of partial-stroke operation (for example,
check locally, or automatically via Logic solver, or via the PST system the
correct movement of the actuator/valve till 15/20% of the stroke).
The above parameters to check will depend from the partial-stroke test system available.
Considering the application of the above described Partial-Stroke Test procedure, the
“Diagnostic Coverage” is >90 %.
7�4 Proof Test and Periodic Maintenance
We advise to perform the following checks upon each proof test interval complying with
the rules and regulations of the country of nal installation:
Visually check the entire actuator as well as the control system (where foreseen).
Ensure there are no leaks on the actuator parts under pressure.
Check pneumatic connections for leaks. Tighten tube ttings as required.
Check if manual override (where foreseen) is regular.
Check if pneumatic lter cartridge (where foreseen) is sound and lter bowl (where
foreseen) has been cleaned properly.
Check the setting of the relief valves (where foreseen).
Verify that the power uid supply pressure value is within the required range.
Remove built-up dust and dirt from all actuator surfaces.
Inspect actuator paint work for damages to ensure continued corrosion protection.
Touch-up as required in accordance with the applicable paint specication.
Operate the Actuator/Valve assembly for No 2 open/close complete cycles with
complete closing of the valve.
Verify the correct performing of open – close operations (for example, check
locally, or automatically via Logic solver, the correct movement of the actuator).
The Installation, Operation and Maintenance manual denes a minimum maintenance
interval after 500.000 cycles for the EL-O-Matic E and P Series actuators. This addresses
components that may have age related degradation. When the maintenance interval has
elapsed a complete overhaul of the actuator is required.
9
April 2017
SIL Safety Manual
DOC.SILM.EEP.EN Rev. 0
Section 7: Periodic Test and Maintenance Requirements