EasyManua.ls Logo

Endress+Hauser Micropilot FMR51 - Installation; Installation Conditions

Endress+Hauser Micropilot FMR51
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation Micropilot FMR51, FMR52 PROFIBUS PA
20 Endress+Hauser
6.3 Mounting cladded flanges
Use flange screws according to the number of flange holes.
Tighten the screws with the required torque (see table).
Retighten the screws after 24 hours or after the first temperature cycle.
Depending on process pressure and process temperature check and retighten the
screws at regular intervals.
Flange size Number of screws Recommended torque [Nm]
minimum maximum
EN
DN50/PN16 4 45 65
DN80/PN16 8 40 55
DN100/PN16 8 40 60
DN150/PN16 8 75 115
ASME
2"/150lbs 4 40 55
3"/150lbs 4 65 95
4"/150lbs 8 45 70
6"/150lbs 8 85 125
JIS
10K 50A 4 40 60
10K 80A 8 25 35
10K 100A 8 35 55
10K 100A 8 75 115
6.4 Installation in vessel (free space)
6.4.1 Horn antenna (FMR51)
Alignment
Align the antenna vertically to the product surface.
The maximum range may be reduced if the horn antenna is not vertically aligned.
A marking at the flange (somewhere between the flange holes) or the boss enables
alignment of the antenna. This marking must be aligned towards the tank wall as well as
possible.

Other manuals for Endress+Hauser Micropilot FMR51

Related product manuals