8
IQ System Controller 2 Quick Install Guide
Tools/additional
items required
S. NO ITEM NAME QUANTITY SOURCE
1 CT-200-SPLIT 2 IQ Combiner/Enphase Store
2 EP200G-HNDL-R1 (lifting handle) 1 Enphase Store
3 Breakers, dierent ratings 4 Enphase Store/retail outlets *
4 Conduits (with ttings and tting tools) As required Provided by installer
5 Drill 1 Provided by installer
6 5/32" pilot bit 1 Provided by installer
7 Screwdriver 1 Provided by installer
8 Wrench 1 Provided by installer
9 Adjustable wrench 1 Provided by installer
10 Torque wrench 1 Provided by installer
11 Level 1 Provided by installer
12 5/32" Allen key 1 Provided by installer
13 Conductor stripper 1 Provided by installer
14 Electrician’s hole saw (2") or punch set 1 Provided by installer
15 Stud nder (if required) 1 Provided by installer
16 Conduit ground hub rings 1 Provided by installer
17
#10, 1/4" or 5/16" lag bolts or screw 3" long (depending
on attaching wall) - for each wall-mount bracket
3 Provided by installer
*2 Eaton BR240B, 1 Eaton BR260, and 3 Eaton BR220 included with EP200G-SC2-RSD-BRK-KIT.