The M215 meets the requirements of NEC 690.35. Because the DC circuit is isolated and insulated from ground, the
M215 does not require that you install a GEC between microinverters. Ground fault protection (GFP) is integrated into the
microinverter. To support this feature, the PV module must be equipped with DC cables labeled “PV Wire” or “PV Cable.”
c. Select the Grid Prole (if required)
In the continental US, you can skip this step
because the factory settings meet requirements.
If you have selected a country other than the US,
or if you select Hawaii as the state under Location,
the Grid Prole menu appears.
• Select the appropriate prole from the Grid
Prole menu.
• Click Save to submit the form.
For more information on Grid Proles, refer to the
Envoy Communications Gateway Installation and
Operation Manual at:
http://www.enphase.com/support.
1
Register the System
Register the System at the Enlighten website:
https://enlighten.enphaseenergy.com.
a. Log in to Enlighten
• At the installer dashboard, click Add a New
System.
b. Enter System Activation Information
• Enter the System, Installer, Owner, and
Location information.
• Enter the Envoy serial number.
The serial number label is on the back
of the Envoy, near the left mounting bracket.
System Activation form