EasyManua.ls Logo

Entrematic Ditec NES600EH - Routine Maintenance Schedule

Entrematic Ditec NES600EH
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
16
IP2160EN - 2013-10-31
Perform the following operations and checks every 6 months according to intensity of use of the
automation.
Disconnect the 230 V~ power supply and batteries (if fitted) and release the gearmotor:
- Visually check that the gate, the fixing brackets and existing structure have suitable mechanical
strength and are in good condition.
- Check the gate-gearmotor alignment, the distance (2-3 mm) between the groove of the pinion
and the crest of the rack.
- Clean the wheel's sliding guide, the rack and pinion of the gearmotor and slightly lubricate
the rack and pinion. Manually check that the gate slides evenly and without friction.
Connect the 230 V~ power supply and batteries (if fitted) and lock the gearmotor:
- Make sure the limit switches are working correctly.
- Check the power adjustment.
- Check that all control and safety functions are working correctly.
N.B.: For spare parts, see the spares price list.
9. Routine maintenance plan
i

Other manuals for Entrematic Ditec NES600EH

Related product manuals