EasyManua.ls Logo

EP Equipment PB2000 - Operation Procedure; Preadjustments for Operation

EP Equipment PB2000
23 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
( 9 )
GB-6210 Manual
ON!
4. Operation Procedure
4-1-1 Turn on the machine 4-1-2 Warming Up
- Plug the power cord to outlet.
- Turn on the main switch.
- The Heat Preparation Lamp turns on, the
machine is heating the glue in the melt tank.
You can not operate the machine now.
- Warming up time is about 20 minute.
- Start lamp turns on when the machine is ready
to operate, but it keeps heating; please wait 5
more minutes so that the glue in the melt tank
can fully melted.
ON!
ON!
4-1 Preadjustments for operation
Make adjustments to ensure good binding quality when turn on the machine.
ON!
4-1-3 Set the nipping time
- Depress Nipping Time Control Button, you
can adjust the nipping time (between nipping
table raise and nipper plate open).
- For books with 100 sheets, nipping time
should be 5 seconds; for books with 200 sheets
or more, the nipping time should be 8 seconds
or more. For padding, the nipping time should
be 0 second.
4-1-4 Set the clamper width
- Depress clamper open/close button to adjust
the clamper width.
- After each binds, clamper width remains the
same.