EasyManua.ls Logo

EP Equipment PB2000 - Page 20

EP Equipment PB2000
23 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
( 19 )
GB-6210 Manual
5-3-1 Turn on the machine
ON!
- Plug the power cord to outlet.
- Turn on the main switch.
- The Heat Preparation Lamp turns on, the
machine is heating the glue in the melt tank.
5-3-2 Melt glue
ON!
- Warming up time is about 20 minute.
- When Start lamp turns on, keep waiting 10
more minutes so that the glue in the melt tank
can fully melted.
5-3-3 Depress Reset Button
- Keep depressing Reset Button for about 5
seconds, the clamper will move forward and
stop at the front position above the nipper.
ON!
5-3-4 Remove the back cover
- Remove the back cover like above picture.
- Slowly get the back cover to the roller.