11
Toilet installation
Mark the center line of the sewage outlet
on the ground, and install a three-way
angle valve at a suitable position on the
wall according to the size of the toilet.
Install the matching three-way angle
valve
1.
Line
Drain outlet
Equipped with three-way angle valve
305mm
2.
Drain outlet
Rough-in template installation
Align cardboard with the centerline of
drain outlet.
Draw contour line according to cardboard.
1.
2.
Note:
Please use the supplied angle valve when
installing this toilet. Use of another angle
valve not including a filter may result in
blockages in the toilet and bidet
waterways.
If replacing an existing angle valve, please
contact a professional for installation.
Installation Method 1:
NPT 1/2
Installation Method 2:
3. Installation of the flushing battery
1. Remove the male end (red) of the battery
connector from the rear seat cover of the
ceramic.
2. Connect the battery connection wire at
the seat cover end to the female end of the
power-off flushing battery box connection
wire and tighten them.
3. Place the battery box in a suitable
position behind the ceramic. Please ensure
it is not placed too deep inside, as it may be
difficult to remove for battery replacement
in the future.
Kind tips:
The male and female terminals of the battery
connection have positive and negative poles.
There are positioning structures inside the
two terminals. Please do not force them to
plug in, as this may cause damage to the
product.
Battery connection
cable at the seat cover
end (male end)
Power outage flushing
battery box connection
cable (female end)
After connecting the wires,
place the battery box in a
suitable position