EasyManua.ls Logo

Epson EMP-822 - Page 72

Epson EMP-822
106 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4-23
EMP-822/EMP-83/EMP-X5/EMP-S5
SEIKO EPSON Revision:A
When reassembling the Shutter Spring and the Shutter Ball, assemble in the
order of the following.
1). Keep the Shutter A open.
2). Put the Shutter Ball into the hole of the Shutter Frame.
3). Move the Shutter Ball to the direction of the arrow, then squeeze and
insert the Shutter Spring to the hole of the Shutter Frame. (Be careful not
to lose the Shutter Ball and the Shutter Spring during assembly.)
Figure 4-17.
Shutter Frame
Shutter Ball
Shutter Spring

Table of Contents

Other manuals for Epson EMP-822

Related product manuals