EasyManua.ls Logo

ERTE B3 - Matters to Consider

ERTE B3
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1. MATTERS TO CONSIDER
The device must be operated from an earthed socket.
It should not be connected to the same power line with powerful electrical
machines and should not be operated near
Make sure that the electrical connection is cut before the cover of the
device is disassembled.
Recommended cable thickness for load cell connection is 1 mm². If it is
necessary to use thinner cable, it should be thickened by using double (or
more) ends for ±supply. This is especially important for long cable
connections.
If the load cell/collection box connection does not have sensing leads (4-
way connection) device will give Error 3. In such cases, connect the
sensing leads to the supply terminals at the closest point to the load cell.
(See wiring diagram.)
Shielded and twisted-pair cable for load cell and communication
connections should be used.
For the most accurate weighing results, the device should be left in
operation for at least half an hour before calibration.
2