5 OPERATION
0463 431 101
- 14 -
© ESAB AB 2017
5 OPERATION
General safety regulations for handling the equipment can be found in the "SAFETY"
chapter of this manual. Read it through before you start using the equipment!
WARNING!
Secure the equipment - particularly if
the ground is uneven or sloping.
NOTE!
To achieve the best possible result at Mig short pulsing, the welding and return
cables must not exceed 10 m (33 ft).