EasyManua.ls Logo

ESAB PLASMAWELD 402 - Welding

ESAB PLASMAWELD 402
22 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
Welding
A. Plasma welding
1. Current down slope time can be adjusted at poti c to give a delay time of 0,5 to 5,0 s.
after the third operation in the 4-stroke mode has been activated (see t
a
in diagram).
2. Position of poti
h defines duration of current up-slope (see t
r
in diagram), whereas time of
down-slope t
f
is set at poti m.
3. Activate torch- or foot switch (lamp g will light) 1. and 2. stroke.
4. To finish the welding operation, down-slope is initiated by actuating torch- or foot- switch.
3. stroke (closing of keyhole)
5. After the time set at poti
c has passed, down-slope starts. When down-slope is over,
switch can be released.

Related product manuals