Platinous User’s Manual 43
Installation
Use water pipe for the supply and drainage lines.
1. Rig piping between the supply source and the chamber. Use piping that fits the water supply and drain
ports (1/2” FPT)
2. Wrap the male end threads of the nipple and pipes with sealant tape.
FIGURE 5.23. WRAPPING THREADS WITH SEALANT TAPE
3. Attach the water pipes to the supply and drain ports on the chamber.