EasyManuals Logo

ESPEC Platinous ESL-4C Series User Manual

Default Icon
125 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #49 background imageLoading...
Page #49 background image
Platinous User’s Manual 43
Installation
Use water pipe for the supply and drainage lines.
1. Rig piping between the supply source and the chamber. Use piping that fits the water supply and drain
ports (1/2” FPT)
2. Wrap the male end threads of the nipple and pipes with sealant tape.
FIGURE 5.23. WRAPPING THREADS WITH SEALANT TAPE
3. Attach the water pipes to the supply and drain ports on the chamber.
Sealant tape

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ESPEC Platinous ESL-4C Series and is the answer not in the manual?

ESPEC Platinous ESL-4C Series Specifications

General IconGeneral
BrandESPEC
ModelPlatinous ESL-4C Series
CategoryClimate chamber
LanguageEnglish

Related product manuals