EasyManua.ls Logo

eta T2-BT User Manual

eta T2-BT
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
2016-04-22
EN
0000000084
V.007
X.36.0
93959-001
Control extension
T2-BT
Operating Instructions

Other manuals for eta T2-BT

Question and Answer IconNeed help?

Do you have a question about the eta T2-BT and is the answer not in the manual?

eta T2-BT Specifications

General IconGeneral
Brandeta
ModelT2-BT
CategoryControl Panel
LanguageEnglish

Summary

General

General information

Covers copyright, technical alterations, symbols, and safety instructions.

Warranty, guarantee and liability

Details requirements for product function, system expansion, repairs, and proper installation.

Safety

Covers electrical shock, configuration errors, and conductor types for wiring.

Functional description

T2-BT control extension

Adds ETAtouch panel and interfaces; lists possible extensions like heating circuits and solar systems.

T4-0 control extension

Optional extension with MK-E circuit board for additional heating circuits.

Technical data

Details dimensions, inputs/outputs, power specifications, and energy efficiency calculation factors.

Installation

Install T4-0 board in the wall housing

Instructions for mounting the T4-0 board onto the wall housing spacers.

Fasten wall housing to wall

Guidance on securing the wall housing to the wall using attachment holes.

Install T4-0 board

Connecting data and power supply between T4-0 and GM-C boards.

Specifications

Cables

Details specifications for CAN bus lines and data cables, including types and lengths.

ETAtouch control panel BE-P2

Identifies sockets for CAN bus, data line, and terminal for yellow jumper on the BE-P2 panel.

Set node number on ETAtouch control panel

Steps to set the node number via the system settings menu to [Service] level.

Installation

Explanation of symbols

Explains symbols for boiler types, control panels, and node switches.

T2-BT control extension with integrated ETAtouch control panel

Illustrates the T2-BT control extension connected with an ETAtouch control panel.

ETAtouch control panel BE-P

Depicts the ETAtouch control panel BE-P.

Node number of the BE-P

Illustrates the node number setting for the BE-P.

Node switch on the circuit board

Shows how to set the node switch on a circuit board.

T2-BT control extension

Switch off heating system

Procedure to safely switch off the heating system before commencing work.

Connect CAN bus lines

Guidance on connecting circuit boards using CAN bus lines and circuit diagrams.

Set yellow jumpers

Instructions for setting yellow jumpers on circuit boards at CAN bus connection ends.

Set node numbers

How to set node numbers for circuit boards and ETAtouch control panels consecutively.

Switch on heating system

Procedure to switch the heating system back on and perform checks.

WARNING! Maximum length of CAN bus lines

Warning about observing maximum CAN bus line length to ensure proper operation.

WARNING! Configuration errors caused by multiple use of node numbers

Warning regarding configuration errors from duplicate node numbers and how to correct them.

Electrical connections

Electrical connection must only be made by qualified specialist personnel

Emphasizes that electrical installation requires qualified specialist personnel.

Configuration

Instructions on switching on the control extension and configuring the heating system.

Requirements

Details requirements for power supply, mains protection, and cable types.

CAUTION! Flexible stranded conductors

Caution regarding the use of flexible stranded conductors for wiring to avoid warranty issues.

Maximum outputs

Table listing maximum power for 230 V output and switching capacity for potential-free output.

DANGER! Electric shock

Danger warning about live parts on circuit boards and necessary safety precautions.

Potential equalization and overvoltage protection

Recommendations for potential equalization and overvoltage protection

Advice for qualified personnel on correct earthing and potential equalization.

Main potential equalization

Details on connecting conductive parts to foundation ground via equalization bars and cables.

Potential equalization between buildings

Considerations for equalization current flow between buildings via CAN bus connection shielding.

Standardized lightning and overvoltage protection

Recommendations for overvoltage protection complying with local conditions and regulations.

WARNING! Maximum length of CAN bus lines

Warning about CAN bus line length limits and their effect on software interface display.

Circuit board GM-C2

Terminal

Table listing terminals and their functions on the GM-C2 circuit board with standard assignments.

Terminal

Table listing remaining terminals and functions for the GM-C2 circuit board, including CAN-Bus and RS-485.

NT-10VA circuit board

Terminal

Table detailing terminals and default assignments for the NT-10VA circuit board, including fuse and supply connections.

MK-E1 circuit board

Terminal

Table listing terminals and default assignments for the MK-E1 circuit board, covering supply, outputs, and inputs.

Concluding activities

Check node numbers

Procedure to compare node numbers of circuit boards and control panels on the ETAtouch system.

Related product manuals