EasyManua.ls Logo

EVERGLIDER 253CC - Page 110

Default Icon
143 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
110
Routine Maintenance
Notice:
All drains and pumps must be properly win-
terized before winter lay-up.
Operate the thru-hull valves once a month and
service as required.
Run all overboard pumps briey at least once
a month to keep them operating properly.

Table of Contents