9
PUMP FED INSTALLATION
To set up the Cetus Sieve so it is ready for a Pump Fed installation you will need to
fit the 4” to 1½” eazy connector and pipe assembly to the inlet. Use a nut runner to
tighten up the jubilee clips to ensure a tight fit.
The inlet on pump-fed is now reduced from 4” to take 1½” pipe.
The outlet on pump-fed is ready to take 4” pipe as factory fitted.
The waste connection is ready to connect to 3” pipe
The pump fed Cetus will look like this:
Figure 6a
Figure 6c
Figure 6b
Figure 6d
WASTE
INLET
OUTLET