EasyManua.ls Logo

Evolution Aqua Cetus sieve - Pump Fed Cetus Sieve Installation

Evolution Aqua Cetus sieve
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
PUMP FED INSTALLATION
To set up the Cetus Sieve so it is ready for a Pump Fed installation you will need to
fit the 4” to 1½” eazy connector and pipe assembly to the inlet. Use a nut runner to
tighten up the jubilee clips to ensure a tight fit.
The inlet on pump-fed is now reduced from 4” to take 1½” pipe.
The outlet on pump-fed is ready to take 4” pipe as factory fitted.
The waste connection is ready to connect to 3” pipe
The pump fed Cetus will look like this:
Figure 6a
Figure 6c
Figure 6b
Figure 6d
WASTE
INLET
OUTLET

Other manuals for Evolution Aqua Cetus sieve

Related product manuals