12
GRAVITY FED INSTALLATION
To set up the Cetus Sieve so it is ready for a Gravity Fed installation you will need to
fit the 4” to 1½” eazy connector and pipe assembly to the outlet. Use a nut runner
to tighten up the jubilee clips to ensure a tight fit.
The gravity fed Cetus will look like this:
The inlet on gravity-fed is factory supplied to take 4” pipe
The outlet on gravity-fed is now ready to connect to 1½” pipe
The waste connection is ready to connect to 3” pipe
WASTE
OUTLET
INLET
Figure 9a
Figure 9c
Figure 9b
Figure 9d