EasyManua.ls Logo

Evolution Aqua Nexus 300 - Page 15

Default Icon
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5. When all 4 pilot holes have been drilled, use the
25mm screws and O-Rings, provided, to screw the
box onto the Nexus. Use a pozi drive screwdriver to
tighten the 4 screws up.
500mm
Air line
6. Use the 4 screws and O-Rings you removed in
Step 2 to tighten up the lid on the Air Valve Control
box.
7. The Air Valve Control Box is fitted into position
ready for air line installations.
15

Other manuals for Evolution Aqua Nexus 300

Related product manuals