EasyManua.ls Logo

Exodraft MEC24 - Intermittent Chimney Fan Operation (120 V)

Exodraft MEC24
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4.3 Intermittent chimney fan operation (120 V)
The control can be interlocked with an appliance in two ways:
It can be interlocked directly with an appliance control, or with a dry set of contacts.
Interlock with Burner
Figure 8 shows how an appliance control signal (10-230V AC/DC) is connected to the MEC24:
y Connect the power supply to terminals 1, 2 and 3.
y Connection to the appliance:
Connect the boiler start signal to terminals 12 and 13
The start signal to the burner is now activated by terminal 14.
Connect Neutral to terminal 15.
y To connect the chimney fan:
If using a 1x120V chimney fan, connect it to terminals 4, 5 and 6. Refer to the fans Installation manual.
If using a 3-phase fan and VFD, connect the VFD to terminals 20 and 21 as shown in Fig. 10 and 11.
DO NOT connect the fan directly to the MEC24 control.
y The XTP-transducer is connected to terminals 22, 23 and 24.
XTP2
COM Vout Vin
Connection to 120 V Fan - Intermittent Operation
1 x 120V AC
Fig. 8
10
3120066 MEC24 US 20210325