1. Insert the anchor bolts for the operator up
through the foundation plate
2. Bend the legs down so they are vertical.
3. Bend the feet on the legs to a horizontal
orientation.
Figure 5. Preparing the optional FAAC
foundation plate
Gate
Outside
Inside
Chain bracket
U bolt
(2 required)
(2 required)
Chain
Operator
15/16 in.
(2.4 cm)
Figure 6. Dimensions for installing the chain,
top view
Figure 7. How to install the chain around the
sprockets
Gate
Spacer
Bolt
Rack
Washer
Figure 8. Placement of spacer, washer, and bolt
(a) Welding a rack spacer to the gate leaf
(b) Note use of inverted rack section
Invert a rack
section to align
and space each
additional rack
section
Figure 9. Welding rack sections