EasyManua.ls Logo

FAAC J275 2K HA - Manual Operation and Restoration

FAAC J275 2K HA
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
16
17
18
19
J275 2K HA 13 532208 - Rev.A
5
8T30
10
45 Nm
1
3
2
2
1
Translation of the original instructions
ENGLISH
9. Remove the eyebolts and fasten the bollard to the pit using the
ten M12x30 screws.
10. Fasten the cover to the frame using the eight M6x10 screws.
L
To reposition or lift the cover, prise one of the two slots upwards using
a screwdriver.
4.6 MANUAL OPERATION
!
Before carrying out the release procedure, disconnect the power supply
to the automation system.
RELEASE PROCEDURE
1. 18Remove the plugs 1 and unscrew the screws 2.
2. Unscrew the plug 3.
3. 19Insert the key 1 and turn it anticlockwise until it stops 2.

Related product manuals