J275 2K HA 3 532208 - Rev.A
Translation of the original instructions
ENGLISH
EU DECLARATION OF CONFORMITY
The Manufacturer
Company name: FAAC S.p.A. Soc. Unipersonale
Address: Via Calari, 10 - 40069 Zola Predosa - BOLOGNA - ITALY
hereby declares on his sole responsibility that the following products:
Description: Automatic retractable bollard
Model: J275 2K HA
comply with the following applicable EU legislations:
2014/30/EU
2011/65/EU
Furthermore, the following harmonised standards have been applied:
EN61000-6-2:2005
EN61000-6-3:2007 + A1:2011
Bologna, Italy, 11-01-2017 CEO
TABLES
1 Symbols: notes and warnings on the instructions ........ 4
2 Technical data ................................................. 8
3 Troubleshooting ............................................. 18
4 Routine maintenance........................................ 20
APPENDICES
1 Double configuration installation (M30) .................. 23
CONTENTS
EU Declaration of conformity ................................... 3
1. INTRODUCTION TO THE INSTRUCTION MANUAL ........... 4
1.1 Meaning of the symbols used ................................... 4
2. SAFETY RECOMMENDATIONS .................................. 5
2.1 Installer safety .................................................... 5
3. J275 2K HA .......................................................... 6
3.1 Intended use ...................................................... 6
3.2 Limitations of use ................................................. 6
3.3 Unauthorised use ................................................. 6
3.4 Emergency use .................................................... 6
3.5 Product identification ............................................ 6
3.6 Technical characteristics ......................................... 7
3.7 Component identification ....................................... 7
Installation accessories (supplied separately) ................ 7
Optional Accessories ............................................ 8
3.8 Dimensional drawing ............................................ 8
4. INSTALLATION ..................................................... 9
4.1 Making the hole .................................................. 9
4.2 Assembling the pit ............................................... 9
4.3 Making the cage .................................................10
4.4 Cementing........................................................11
4.5 Installing the bollard ............................................12
4.6 Manual operation................................................13
Release procedure ..............................................13
Restoring automatic operation ...............................14
5. ELECTRICAL SYSTEM............................................ 15
5.1 Connections ......................................................15
5.2 Board programming.............................................16
5.3 Connecting multiple bollards ..................................16
5.4 Troubleshooting .................................................18
6. MAINTENANCE ................................................... 19
6.1 Removing the hydraulic unit ...................................19
6.2 Topping up the oil level .........................................20
6.3 Bleeding the system .............................................20
6.4 Routine maintenance ...........................................20
7. INSTALLING OPTIONAL EQUIPMENT ........................ 21
7.1 Installing the pressure switch ..................................21
Multiple connections ........................................... 21
7.2 Installing the solenoid valve ....................................22
Connecting the control coil ....................................22
Multiple connections ...........................................23
7.3 Cover ..............................................................23
A. Marcellan