EasyManua.ls Logo

FAAC J275 2K HA - 7 Installing Optional Equipment; Installing the Pressure Switch; Multiple Connections

FAAC J275 2K HA
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
34
35
36
37
J275 2K HA 21 532208 - Rev.A
1
2
5
24
35 Nm
2
1
3
3
1
2
3
4
5
6
1
5
1
4
1
2
1
3
1
1
O
U
1
O
U
2
G
N
D
+
2
4
V
+
2
4
V
O
U
3
8
9
7
1
0
S
O
P
F
S
W
E
M
E
R
G
E
N
C
Y
G
N
D
0
1
9
1
8
O
U
T
4
G
N
D
1
6
1
7
1
5
1
4
1
2
1
3
1
1
6
C
L
O
S
E
O
U
1
O
U
2
O
U
3
G
N
D
+
2
4
V
+
2
4
V
O
U
3
8
9
7
1
0
S
O
P
F
S
W
E
M
E
R
G
E
N
C
Y
G
N
D
0
Translation of the original instructions
ENGLISH
7. INSTALLING OPTIONAL EQUIPMENT
7.1 INSTALLING THE PRESSURE SWITCH
1. 34 Remove the hydraulic unit following points 1 to 5 in the §
"Removing the hydraulic unit section.
2. Place the hydraulic unit in a horizontal position.
3. Remove the plug from the flange 1 and the plug from the cable
gland 2.
4. 35 Screw the pressure switch 1 onto the flange, together with
the seal provided. Insert the cable in to the cable gland 2 and
connect it to connector 3 inside the junction box according to the
diagram shown in the figure.
Pink
BlueBlue
Violet
L
Make sure that terminals 9 and 10 of the external junction box
of the bollard are connected to the JE275 control board as per
25. Otherwise, connect them now.
Carry out a bleed cycle after having reinstalled the hydraulic unit.
MULTIPLE CONNECTIONS
If multiple bollards (max 3) are installed, which are controlled by a
single JE275 board, connect the pressure switches in series as indi-
cated in the following diagram.
If multiple bollards (more than 3) are installed, which are controlled
by JE275 boards in a master / slave configuration, connect all the pres-
sure switches in series on the inputs of the master board as indicated
in the following diagram.
Master JE275 board

Related product manuals