Service Policy Continued
Start-Up Record
□ 1. Flexible coupling set screws tightened.
□ 2. Motor adapter guards installed.
□ 3. All anchor bolts tightened to specications.
□ 4. All pipe couplings tightened to specications.
□ 5. Motor rotational direction correct.
□ 6. Motor lubricated to manufacturers specications.
□ 7. Alignment bushing (if present) removed.
□ 8. Final Pump Alignment performed.
□ 9. Inlet pressure indicator installed.
□ 10. Inlet pressure switch (if applicable) installed.
□ 11. Outlet pressure indicator installed.
□ 12. System pipes are clean and upstream ltration in place.
□ 13. System leak checked and all air vented from system.
□ 14. ALL safety devices in place.
Installation and Start-up Information
Start-up Date: _________________________ Model #: _______________________________
Serial #: ______________________________ Installation Date:_________________________
Installed By: ___________________________
Operating Conditions
Feed Flow: ____________________________ Suction Pressure to Pump:_________________
Discharge Pressure: _____________________
Drain ow rate (high inlet pressure option only): _________________________
VFD frequency (Hz) if used ________________ Voltage and Hz of power supply_____________
VFD Amps: ____________ VFD Amps (after 48 hours of running time): ____________________
Baseline vibration reading at pump start-up (optional): ____________
Pump Alignment Measurements
Motor adapter gap A: __________, B: __________, C: __________, D: __________
Distance between pump and motor shafts (dropout coupling only): __________
Pipe Connection(s)
□ Victaulic connection
□ Flanged connection: Flange Pipe Size (Inlet) __________, Gap __________
Flange Pipe Size (Discharge) __________, Gap __________
General Notes:
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
This report has been lled out by: __________________________________Date: ___________