EasyManua.ls Logo

FEDCO MSD-200 - Final Pump Alignment - No Motor Adapter

Default Icon
66 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MSD
TM
Series
© Copyright 2018 Fluid Equipment Development Company | www.fedco-usa.com
- 41 -
Pump Assembly Continued
“REMOVE BEFORE
OPERATION”
Figure 75 - Seperating Coupling Hubs
2. Separate the motor hub from the dropout
hub.
Figure 74 - Alignment Bushing Removal
Final Pump Alignment - No Motor Adapter
NOTES: Motor and pump to be installed on
baseplate and Initial Pump Alignment proce-
dure completed.
NOTES: The following steps outline the dial
indicator method. If using the Reverse Indica-
tor or a Laser Alignment Tool Method, retain
alignment bushing until indication has been
completed.
NOTES: Account for indicator sag. Angularity
determined by coupling manufacturer. Contact
FEDCO or see Sag Test section for additional
information.
1. If present, remove alignment bushing and
retain for future alignment purposes.
16. Install coupling guards and secure screws.
Figure 73 - Coupling Guard Installation

Table of Contents

Related product manuals