EasyManua.ls Logo

Fiessler AKAS-3PM - Prerequisites for Using the Press Brake Protection AKAS

Fiessler AKAS-3PM
58 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Acceptance test: the installation acceptance test and inspections should be carried out by a competent person in possession of all
the information supplied by the manufacturer of the machine and the ESPE.
Upon customer's request, Fiessler Elektronik will perform the initial acceptance as well as the annual test. Additionally,
customer training seminars on how to execute annual tests will be conducted at regular intervals.
The machine owner must make sure that a competent person is assigned to check the light barrier annually. This person can be an
employee either from the light-barrier manufacturer or from the operator's staff. The annual test shall be executed according to
the inspection sheet on pae 49.
“Complies with 21CFR and 1040.10 and 1040.11".
"Caution! the use of controlss or adjustments or performance of procedures other than those specified herein may result in
hazardous radiation exposure."
Attention! L'utilisation de commandes ou de réglages ou l'exécution de procédures autres que ceux et celles spécifiés
dans le présent manuel risque d'entraîner une radioexposition dangereuse.
Safety Instructions
2
Prerequisites for using the press brake protection AKAS®
2.1
FIESSLER
E L E K T R O N I K
Annual Inspection
Acceptance
Doku Nr. 1379 Stand 27.1.2017 /Aui
Produkt conformance