3-2 FT-100/CI and FT-170/CI Operation Guide
Document 40275-0913
3.1 Overview of Operating the FT-100/CI
and FT-170/CI
3.1.1 Steps
To begin a new production run or work shift:
1. Start the FT-100/CI or FT-170/CI, as described in Starting
the FT-100/CI or FT-170/CI.
2. Clear the current counters, as described in Clearing the
Current Counters.
3. Verify or select the appropriate case type, as described in
Selecting the Case Type
.
4. Verify or change the inspection beam height, as described in
Adjusting the Height of the Inspection Beam
.
5. Verify or change the guide rail position, as described in
Adjusting the Guide Rails
.
6. Verify or change the flap sensors positions, if inspecting
flaps, as described in Adjusting the Flap Inspectors
.