EasyManua.ls Logo

Filtec FT-100 - Overview of Operating Procedures

Default Icon
70 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3-2 FT-100/CI and FT-170/CI Operation Guide
Document 40275-0913
3.1 Overview of Operating the FT-100/CI
and FT-170/CI
3.1.1 Steps
To begin a new production run or work shift:
1. Start the FT-100/CI or FT-170/CI, as described in Starting
the FT-100/CI or FT-170/CI.
2. Clear the current counters, as described in Clearing the
Current Counters.
3. Verify or select the appropriate case type, as described in
Selecting the Case Type
.
4. Verify or change the inspection beam height, as described in
Adjusting the Height of the Inspection Beam
.
5. Verify or change the guide rail position, as described in
Adjusting the Guide Rails
.
6. Verify or change the flap sensors positions, if inspecting
flaps, as described in Adjusting the Flap Inspectors
.

Table of Contents

Related product manuals