FINES – OPERATING INSTRUCTIONS – ENGLISH version
Prover HTB »HTB16,10-M in HTB16,10-D »
IT IS FORBIDDEN TO INSTALL THE PROVER IN A PLACEHTWOI UT APPROPRIATE
VENTILATION SYSTEM!
The place desiganted for installation of the proverhas to be prepared in line with the manufacturer‘s
instructions prior to the installation. Accordingly the purchaser (or a designer) has to ensure the
following:
– A spacious position at appropriate distance from the walls and the ceiling
– Electrical supply of appropriate electrical power supply, appropriate fuses and nearby main switch
– Connection of the appliance to the potential equalization – separate grounding conductor
– Connection to the cool water supply with a soften ing system having a valve
– Ventilation system and steam suction above the prover
6.0. INSTALLATION
6.1. - ELECTRICAL CONNECTION
ELECTRICAL CONNECTION OF THE PROVER CAN ONLY BE DONE BY A DULY
AUTHORISED PERSON!
PLEASE FOLLOW ALL REGULATIONS FOR SAFE WORK WHEN INSTALLING THE
ELECTRICAL DEVICE!
In order to electrically connect the prover, it is necessary to use a standardized connector cable with
a rubber insulation H 05 RN–F5 G 2,5 mm
2
, factory already installed onto the prover. In case that the
prover is installed in countries with power supply 110 V / 60 Hz, the cable cross-section correspondingly
increases.
The cable must be physically protected by a plasticpipe or a tube, so it is not directly exposed to
outsideinuences!
The device must be grounded in accordance with the safety of electrical equipment!
Equalisation of potentials is carried out onto the screw marked with a symbol, which is located below
the feedthrough for electrical connection, on the back side of the prover!
A separate 3-core cable must be provided for the prover from the electrical cabinet of the facility,
whose cross section corresponds to the maximum electrical powerof the prover with appropriate
protection with one-phase automatic circuit breaker;
6.2. WATER CONNECTION
Watersupplyislocatedontherearleftbottomside.Connectionismadewithasuppliedexibledelivery
pipeforwaterattachedtodistributionnetworkvalveorbyathreadedpipewithaľ.Theconnectionshouldbe
made so that it cannot be removed in the event of a pressure overload.
Sand trap shall be installed before the entering of the water into the prover and due to scaling is advisable to
also install a water softener.