EasyManua.ls Logo

Fire Pump 8100 Series - 5 Delivery, Handling, and Storage; Delivery; Handling; Bare Shaft Pump (Model 100)

Fire Pump 8100 Series
54 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Serie
s
11
s
8100/8150/820
5
D
s
5.1
D
The pump i
s
specially d
e
similar veh
determine
w
transport o
r
Pumps and
mounted on
packaged i
n
or attached
t
If any dam
a
agent.
5.2
H
5.2.1
B
The bare s
h
Place a nyl
o
pulled tight
0/9100 Fire Pu
m
D
elivery, h
a
torage
D
elivery
s
delivered from
e
signed for tran
s
icle. Upon recei
p
w
hethe
r
any da
m
handling.
drive
r
s are norm
a baseplate. Pa
r
n
a separate con
t
t
o the baseplate.
ge has occurre
d
H
andling
WARNING
Lifting devic
must only b
e
Eyebolts or
for lifting th
e
attached. D
o
suspended l
device or ri
g
personal inj
u
NOTICE
Dispose of a
with local re
g
B
are Shaft P
u
h
aft pump shoul
d
o
n sling around
choker hitches.
Fig. 1 How t
o
m
p
a
ndling, a
the factory in
a
s
port by fork-lift
t
p
t, check the pu
m
age has happe
n
ally shipped fro
m
r
ts and accesso
r
t
ainer and shipp
e
d
, promptly notif
y
es must be suff
i
e
used by autho
lifting lugs, if pr
o
e
components t
o
o
not stand und
e
oads. A failure
i
g
ging can result
u
ry or death, or
l
l packing materi
a
g
ulations.
u
mp (Model
d
be lifted as sh
both bearing s
u
o
lift a Model 1
0
nd
a
container
t
ruck or a
mp visually to
n
ed during
m
the factory
r
ies can be
e
d with the pum
p
y
the carrier’s
i
ciently strong a
rized personnel
o
vided, are onl
y
o
which they are
e
rneath
i
n the lifting
in serious
property dama
g
a
ls in accordanc
e
100)
own in Fig. 1.
pports using
0
0
p
nd
.
y
g
e.
e
5.2.
2
5.2.
2
Larg
e
ends
the h
o
the p
o
base.
hook
s
will b
e
5.2.
2
Pum
p
show
n
housi
n
the m
Make
cond
u
place
positi
o
2
Comple
t
2
.1 Bases su
e
bases are sup
p
of the base, as
s
o
les provided in
t
o
ints of the hook
s
Attach nylon sli
n
s
. Size the equip
m
e
less than 45° f
r
Fig. 2 How to
2
.2 Bases su
WAR
N
Do n
o
casin
g
p
units supplied
w
n in Fig. 3. Plac
e
ng. Place the re
m
m
oto
r
as close to
t
e
sure the sling d
o
u
it box. Join the
f
over the lifting
h
o
ning the sling u
t
e Pump uni
t
u
pplied with li
p
lied with lifting h
s
hown in Fig. 2.
P
t
he four corners
s
do not touch t
h
n
gs, chains, or
w
ment for the loa
d
r
om the vertical.
lift a Model 150
M
u
pplied witho
u
N
ING
o
t use the lugs
o
g
to lift the pum
p
w
ith bases witho
e
one sling arou
n
m
aining sling ar
o
the mounting fe
e
o
es not damage
f
ree ends of the
s
h
ook. Use extre
m
nder the motor
s
A
t
(Model 15
0
fting holes
oles in the sides
P
lace lifting hoo
k
of the base. Be
s
h
e bottom of the
p
w
i
r
e rope to the li
f
d
, so that the lift
a
M
pump unit larg
e
u
t lifting hole
s
o
n the pump up
p
p
unit.
ut lifting holes,
a
n
d the outboard
b
o
und the back e
n
e
t as possible.
the housing cov
s
lings together a
n
m
e care when
s
o it cannot slip o
A
C6102 Rev 03
0
M)
or the
k
s in
s
ure
p
ump
f
ting
a
ngle
e
base
s
p
er
a
s
b
earing
n
d of
er or
nd
o
ff.

Table of Contents