EasyManua.ls Logo

Fire Pump 8100 Series - Leveling the Baseplate; Grouting

Fire Pump 8100 Series
54 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
AC61
0
0
2 Rev 03
grooved be
f
surface for t
h
Foundation
6. An option
the top of th
e
alignment t
o
bolt length f
o
washers. T
h
several day
s
In installati
o
particularly
mass of at
l
7.3
L
Use blocks
a
anchor bolt
s
baseplate a
p
foundation,
w
plate, as sh
o
By adding o
plumb the p
u
have to be l
e
Draw ancho
motor shaft
s
o
re the concrete
h
e grout.
bolts should be
s
al 4 inch [102m
m
e
concrete will a
l
o
match the hole
s
o
r grout, shims, l
o
h
e foundation sh
o
s
before the bas
e
o
ns where lower
important, we r
e
l
east 5 times th
a
Fig. 6
L
eveling the
WARNING
Lifting devic
e
must only b
e
Eyebolts or l
lifting the co
m
attached. D
o
loads. A fail
u
can result in
or property
d
NOTICE
This proced
u
foundation h
a
hold down b
o
the pump un
pump and d
r
aligned at th
e
mounted, co
n
recommend
a
assume res
p
a
nd shims unde
r
s
and midway be
t
p
proximately 1 i
n
w
ith studs exten
d
o
wn in Fig. 7.
r
removing shim
s
u
mp shaft and fl
a
e
vel.
r
nuts tight agai
n
s
or coupling hub
sets; this provid
e
s
et in concrete a
s
m
] long sleeve ar
o
low some flexibi
l
s
in the base plat
o
wer base plate
o
uld be allowed
t
e
plate is shimm
e
sound and vibr
a
e
commend a fo
u
a
t of the compl
e
Foundation
baseplate
e
s must be suffi
c
e
used by author
i
ifting lugs, if pro
v
m
ponents to whi
c
o
not stand unde
r
u
re in the lifting
d
serious person
a
d
amage.
u
re assumes tha
t
a
s been prepare
d
o
lts extending u
p
i
t. It must be un
d
r
iver have been
m
e
factory. If the d
n
sult AC Fire Pu
m
a
tions. AC Fire P
p
onsibility for fina
r
the baseplate f
o
t
ween bolts, so
a
n
ch [25.4mm] ab
o
d
ing through hol
e
s
under the bas
e
a
nges. The base
n
st base, and ob
s
s for alignment.
(
e
s a bonding
s
shown in Fig.
o
und the bolts a
t
l
ity in bolt
e. Allow enough
flange, nuts and
t
o cure for
e
d and grouted.
a
tion levels are
u
ndation with a
e
te pump unit.
c
iently strong an
d
i
zed persons.
v
ided, are only f
o
c
h they are
r
neath suspend
e
d
evice or rigging
a
l injury or death,
t
a concrete
d
with anchor or
p
ready to receiv
e
erstood that the
m
ounted and rou
g
river is to be fiel
d
m
p for
ump cannot
l alignment.
o
r support at the
a
s to position the
o
ve the concrete
e
s in the base
e
, level and
p
late does not
s
erve pump and
(
Temporarily
t
d
o
r
e
d
e
g
h
d
remo
v
chec
k
If alig
n
appr
o
retigh
align
m
align
m
NOT
E
mutu
a
facilit
y
Chec
k
pum
p
Pour
g
Grou
t
pipin
g
grouti
7.4
Grou
t
weig
h
appr
o
unit,
(
Build
grout
.
and t
h
be co
After
t
found
align
m
Appr
o
when
to th
e
from
c
v
e coupling gua
r
k
ing alignment.)
nment needs im
p
o
priate positions
h
tening of the an
c
m
ent. Repeat thi
s
m
ent” is reached
E
: Reasonable a
a
lly agreed upon
y
(final operator)
.
k to make sure t
h
p
flanges without
grout in the bas
e
t
ing) and allow g
r
g
to pump. (24 h
o
i
ng procedure.)
Fig.
7
Groutin
g
t
compensates f
o
h
t of the pump u
n
o
ved, non-shrinki
(
see Fig. 7).
a strong form ar
o
.
Soak the top of
h
en remove any
o
mpletely filled wi
the grout has th
o
d
ation bolts and t
m
ent after the fo
u
o
ximately 14 day
s
the grout has th
e
exposed edges
c
oming in conta
c
r
d, see section 8
p
rovement, add
s
under the basep
c
hor nuts will shi
f
s
procedure until
.
lignment is defin
e
by pump contra
.
h
at the piping c
a
placing pipe str
a
e
plate completel
rout to dry thoro
u
o
u
r
s is sufficient
7
Leveling of pu
m
g
or
uneven found
a
n
it, and prevents
ng grout, after s
e
o
und the founda
t
the concrete fo
u
surface water. T
i
th grout.
o
roughly harden
e
t
ighten if necess
a
u
ndation bolts ar
e
s after the grout
h
oroughly dried,
a
of the grout to p
c
t with the grout.
.2 Coupling Gua
s
hims or wedge
s
late, so that
f
t the shafts into
c
a “reasonable
e
d as that which
ctor and the acc
e
a
n be aligned to t
h
a
in on either flan
g
y (see section 7
.
u
ghly before atta
time with appro
v
m
p unit
a
tion, distributes
shifting. Use an
e
tting and levelin
t
ion to contain th
u
ndation thoroug
h
he base plate s
h
e
d, check the
a
ry. Check the
e
tightened.
has been poure
d
a
pply an oil base
revent air and m
16
rd, for
s
at
closer
is
e
pting
he
g
e.
.
4
ching
v
ed
the
g the
e
h
l
y
,
h
ould
d
or
paint
oisture

Table of Contents