EasyManua.ls Logo

Fire Pump 8100 Series - Grease Lubrication; Lubrication Procedure; Packed Stuffing Box; Packing Specifications

Fire Pump 8100 Series
54 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Serie
s
29
s
8100/8150/820
9.3.2
G
Grease lubr
i
factory and
o
provided th
e
to its first o
p
The bearing
should nev
e
grease, and
checked m
o
frame rise a
determine t
h
9.3.3 L
Add grease
Adequate lu
maintained
a
of the cavity
greater am
o
vent and be
To lubricate
1. Remo
v
2. Fill the
recom
m
3. Wipe
o
4. Run th
e
The bearing
grease due
return to no
r
grease from
9.4
P
9.4.1 P
Pumps are
s
fiber packin
g
equivalent.
0/9100 Fire Pu
m
G
rease Lubri
c
WARNING
Never chec
k
frame by ha
n
device.
CAUTION
Greases of
d
etc.) may n
o
Mixing grea
s
lubricant lif
e
i
cated ball beari
n
o
rdinarily will req
e
pump has bee
n
p
eration.
temperature, m
e
e
r exceed 225°F
180°F [82°C] fo
o
nthly. Should th
e
bove the limit, t
h
h
e cause.
ubrication p
r
CAUTION
Over-greasi
n
overheating
CAUTION
Use only ma
may damag
e
unnecessar
y
overheating
d
unsightly co
n
while the pump i
brication is assu
a
t about the cap
a
between the be
a
unt will, as a rul
e
wasted.
the bearings wi
t
v
e dirt from the g
grease cavities
m
ended grease.
o
ff any excess gr
e
e
pump to distri
b
temperature us
u
t
o an excess su
p
r
mal as the pum
p
the bearings.
P
acked Stuf
f
acking spe
c
s
upplied with a
g
g
as standard, u
s
m
p
c
ation
the temperatur
e
n
d, use a tempe
r
d
ifferent bases
(
o
t be compatibl
e
s
es can result i
n
and premature
n
gs are packed
w
ui
r
e no attention
stored in a clea
n
e
asured at the b
[107°C] for poly
u
r lithium-based
g
e
temperature o
f
h
e pump should
b
r
ocedure
n
g is the most
c
and premature
n
ual grease gun
.
e
the bearings or
y
loss of grease,
c
d
ue to ove
r
-grea
s
n
ditions around t
h
s stopped to av
o
red if the level o
f
a
city of the beari
n
a
ring and greas
e
e
, be discharged
t
h grease, proce
e
rease fitting.
t
hrough the fittin
e
ase.
b
ute the grease.
u
ally increases
a
p
ply of grease.
T
p
runs and purg
e
f
ing Box
c
ifications
g
raphite-coated
g
s
ing John Crane
e
of the bearing
r
ature measurin
g
(
lithium, polyure
e
when mixed.
n
reduced
bearing failure.
w
ith grease at th
e
before starting,
n
, dry place prio
r
earing frame,
u
rea-based
g
rease when
f
the bearing
b
e shut down to
c
ommon cause
o
bearing failure.
.
High pressure
seals, cause
c
reate a danger
o
s
ing, and produ
c
h
e bearing.
o
id overloading.
f
grease is
n
g and 1/3 to 1/
2
e
fitting. Any
by the seal or
e
d as follows:
gs with the
a
fter you re-
T
emperatures
e
s the excess
g
eneral service
style 1340, or
g
a,
e
r
o
f
o
f
c
e
2
9.4.
2
In ac
c
shoul
d
rate
c
nuts
m
whic
h
Whe
n
move
furth
e
Neve
r
new
r
9.4.
3
9.4.
4
New
p
speci
f
Whe
n
off le
n
Usua
l
If mol
side
w
If coil
mark
in. [3
-
exce
s
unde
r
miter
e
poor
f
Fit th
e
remo
v
rings
form
e
Plac
e
butt
o
the st
the jo
the t
w
Push
reas
o
but it
The r
i
and t
h
prec
e
o’clo
c
2
Packing
c
ordance with th
e
d be visually ins
p
c
hecked. If the le
a
m
ay be tightene
d
h
should be least
n
the gland follo
w
e
ment and the p
a
e
r, all of the pac
k
r
reuse old and l
i
r
ings.
3
Remova
l
WAR
N
Ensu
r
allow
s
packi
n
packi
n
stuffin
packi
n
the s
h
eccen
shoul
d
4
Installin
g
p
acking may be
f
ied dimensions
n
supplied as a
c
n
gths of material
lly 5 or 6 rings a
r
ded rings are us
w
ays and the
j
oin
t
packing is used
,
the cutting positi
-
6mm] over size.
s
s length is requi
r
sized. Cut one r
e
d (45°) joint. (A
n
f
itting mitered joi
n
e
ring over the s
h
v
e and cut all ot
h
are placed arou
n
e
d.
e
the first packin
g
o
r mitered
j
oint b
e
t
uffing box. Push
int, and then the
w
o packing ends
the ring to the b
o
o
nable pressure
t
is not over com
p
NOTI
C
The p
and u
sets
b
i
ngs are installe
d
h
e joints stagger
e
e
ding joint. For 3
c
k positions.
maintenanc
e
maintenance s
c
p
ected once a m
a
kage rate is ex
c
d
, until the requir
e
40 to 60 drops
p
w
er has reached
a
cking cannot be
k
ing should be r
e
i
feless packing
o
l
of Packing
N
ING
r
e that the pump
safe handling of
n
g tool should b
e
n
g from the stuffi
n
g box is thoroug
n
g is installed. A
l
h
aft or sleeve for
n
tricity. Any part
s
d
be replaced.
g
Packing
supplied as mol
d
or, more usuall
y
c
ontinuous lengt
h
l
to make the re
q
r
e required per
s
s
ed, the rings sh
o
ts pushed into t
h
,
wrap the packi
n
i
on. The packing
The larger the s
red. The packin
g
ing to accurate
s
n
accurately cut
b
n
t).
h
aft to assure pr
o
h
er rings to the fi
r
n
d the shaft a tig
g
ring around the
e
tween the two
e
the joint first, th
e
two remaining s
are pushed tight
o
ttom of the stuf
f
t
o ensure that th
e
p
ressed.
C
E
p
acking rings m
u
nder no circum
s
b
e fitted as a un
i
d
one at a time,
e
e
d at about 90°
r
adjacent rings,
u
A
e
c
hedule, the pa
c
onth and the lea
k
c
essive then the
e
d leak rate is o
b
p
er minute.
the limit of its
e
compressed an
e
moved and repl
a
o
r merely add so
m
has cooled suffi
c
the stuffing box.
e
used to remov
e
ng box. Make s
u
hly cleaned bef
o
l
so check the co
n
possible scorin
g
s
with significant
d
ed rings made
t
y
, as a length of
c
h
, it is necessar
y
q
uired number o
f
s
tuffing box.
o
uld be opened
h
e stuffing box fir
n
g around the sh
a
should be cut 1
/
haft diameter, th
e
g
must not be cu
t
s
ize with either a
b
utt joint is supe
r
o
per length. The
n
r
st sample. Whe
n
ht joint should b
e
shaft, and form
a
e
nds. Push the ri
n
e
n the side oppo
s
ides. It is essent
i
ly together.
f
ing box, applyin
g
e
ring is seated
p
u
st be fitted indi
v
s
tances should
c
i
t.
e
ach ring seated
r
otation from ea
c
u
se the 4, 8 and
1
A
C6102 Rev 03
c
king
k
age
gland
b
tained,
y
a
ced.
m
e
c
iently to
.
A
e
all old
u
re the
o
re new
n
dition of
g
or
damage
t
o
c
oil.
y
to cut
f
rings.
r
st.
a
ft and
/
8-1/4
e
more
t
butt or
r
ior to a
n
n
the
e
a
neat
n
g into
s
ite to
ial that
g
p
roperly
v
idually
c
omplete
firmly
c
h
1
2

Table of Contents