EasyManua.ls Logo

Fluke 6102 - Authorized Service Centers

Fluke 6102
66 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
Before You Start
Authorized Service Centers
If a mains supply power uctuation occurs, immediately turn off the in strument.
Power bumps from brown-outs and black-outs could damage the instrument. Wait
until the power has stabilized before re-energizing the instrument.
Components and heater lifetime can be shortened by continuous high temperature
operation.
DO NOT operate the instrument without uid.
The input voltage and heater voltage switch settings must always be set to the same
value.
1.3 Authorized Service Centers
Please contact one of the following authorized Service Centers to coordinate service
on your Hart product.
1.888.475.5235info@Fluke-Direct.com
Fluke-Direct.com

Table of Contents

Related product manuals