EasyManua.ls Logo

Fluke 8502A - Page 50

Fluke 8502A
50 pages
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3-77. Switch selections are made through switch
dnvers
which rely on
Vcc
and Vss
being at -l.SV and
—20V
with
respect to analog common. This
allows simple Iransi-
liori
from
TTL levels to FET off
voltages.
D/A
Converter
switches are
selected
on transition
of U3l from one state
to
the next.
The
transition clocks the first of
two “D”
flip-flops which sets the second.
The
output
of the second
larch resets the first and selects the switch. If the polarity
does not
change after
closing a
switch, the output of U6
plus the output
of
Ull
(reference select)
will place
two
highs on the input of one section of AND gate U25.
Through OR
gate,U16,
a one
will be
applied to
the
D
input
of that switch latch.
The
next
transition of
U31 will
clock
the
hitch, keeping the switch closed. If the polarity had
changed, a zero would be applied to the
D input, opening
the
switch.
3-78. After the last step, at completion of
a sample,
the Controller addresses the
A/D
Converter for
autozero.
U3
1 is
clocked to the C7 state causing a digital reset.
When
U6, storage capacitor disable, is reset, autozero is enabled.
RC coupled gates delay
the zero switch
controls so that
switch A1 may be closed and A2 opened in the reference
switching circuit. This
provides
a faster settling time for the
reference switching amplifier. Both A1 and A2 are opened
during the autozero time.

Related product manuals