EasyManua.ls Logo

FoxESS LV5200 - 6.4 Installation Steps

FoxESS LV5200
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
6.4 Installation Steps
· Mounting
STEP-1
Measure and confirm that the bottom of the bracket is 285mm away from the ground, and mark the 5-hole
positions on the bracket with a pen.
STEP-2
Drill holes with electric drill, make sure the holes are deep enough (at least 50mm) for installation, and then
tighten the expansion tubes.
STEP-3
Install the expansion tubes in the holes, and tighten them. Then install the wall bracket by using the expansion
screws.
STEP-4
Hang the battery over the bracket, move the battery close to it, lower the battery, and make sure the 2 mounting
bars on the back are fixed well with the 2 grooves on the bracket.
· Wiring