10
5. Installation
5.1 Packing List
Please un-pack the box, check and make sure you received all items as listed below before installation
(excluding optional items):
5.2 Preparation
- Please refer to the Technical Data to make sure the environmental conditions fit the inverter’s
requirements (degree of protection, temperature, humidity, altitude, etc.)
- Please avoid direct sunlight, rain exposure and snow build-up during installation and operation.
- To avoid overheating, always make sure the air flow around the inverter is not blocked.
- Do not install in places where gas or flammable substances may be present.
- Avoid electromagnetic interference that can compromise the correct operation of electronic
equipment.
- The slope of the wall should be within ±5°.
DC pin contact
(1*positive, 1*negative)